PRD Expert System
Overview
The PRD (Pressure Relief Device) Expert System is configured to assist in the management of clients’ pressure relief devices. This expert system has been configured to allow storage of each PRDs general, design and process data, as well as display each PRD’s inspection history. A PRD inspection plan is automatically calculated following a PRD criticality assessment.
Codes / Standards
N/A
Asset Types
Asset Type |
Description |
---|---|
PRD |
Pressure Relief Device |
PVRD |
Pressure Vacuum Relief Device |
Asset Information
Asset Information |
Description |
Assigned to Type(s) |
---|---|---|
PRD General Information |
General PRD information including tag no., location, associated pipework etc. |
PRD, PVRD |
PRD Design Data |
Valve and body trim data. Sizing basis data. |
PRD, PVRD |
PRD Process Data |
Fluid type and state, pressure, temperature, liquid, and vapor data. |
PRD, PVRD |
PRD Inspection History |
Last inspection data, count of defaults etc. |
PRD, PVRD |
PRD Criticality Assessment |
Criticality, consequence, and confidence grading including justifications. |
PRD, PVRD |
PRD Inspection Plan |
Criticality assessment result, calculated and approved inspection plan (intervals, last inspection date and next recommended date plus overrides). |
PRD, PVRD |
Risk Models
Inspection / Maintenance Events
Event Type |
Description |
Assigned to Type(s) |
---|---|---|
PRD Inspection |
PRD Inspection form - As-received condition and initial test results, strip down internal condition, final test data after overhauling/repairs. |
PRD, PVRD |
PRD Change Out |
Used when the PRD has been changed out. Includes the reason for change out plus serial number removed and installed. |
PRD, PVRD |
Traffic Lights
Note
Traffic Lights are currently not distributed with the Expert System.
Dashboards / Reports
Event Type |
Description |
---|---|
PRD overview |
For each PRD asset, this report displays general PRD information, inspection history, criticality assessment, risk chart and the inspection plan. |