Add/Edit Planning Task Dialog
See below for the description of fields in the Add Planning Task/Edit Planning Task dialogs.
Field/Checkbox Name |
Description |
---|---|
Asset |
Indicates where the task is to be completed. Choose an asset from the hierarchy. You must either specify and asset or an asset type for a planning task. |
Ad Hoc Task |
If you this checkbox, the task generated from this planning task will be flagged as an ad hoc task. |
Start KP/EL / End KP/EL |
Defines the starting and ending kilometre point (KP) or the elevation location where the task is to be performed. These fields are optional. |
Asset Type |
If this task is not relevant to a single asset, but rather a group of assets of a particular type, then choose the asset type by clicking on the ellipsis button. |
Event Type |
Choose the type of event to be scheduled. The event type identifies the inspection method to be scheduled and carried out. This field is mandatory. |
Schedule Type |
A non-required field, used for grouping or categorising. |
Category |
You may optionally create task categories to further group your tasks (for example, tasks that require rope access, tasks that should only be undertaken on days ending in a ‘y’, etc.). |
Requires Shutdown (Manual) |
Indicates whether the asset requires shutdown prior to being completed. |
Requires Shutdown (Lookup) |
Choose a Yes / No AIG field that contains the Shutdown flag for this task. |
Order Number |
Specifies the order in which the tasks are to be completed (for information purposes only). For example, if an asset should be cleaned and then GVI’ed, give the Cleaning task a lower order number than the GVI task. Repeated numbers are OK. Specifying the Order No attribute for individual tasks determines the order they appear in the IC-Inspector Tasks list. |
Approx Timing (Manual) |
This value is used to estimate the overall duration (and optionally, cost) of workpacks. |
Approx Timing (Lookup) |
Choose a Numeric AIG field (if any) that contains the estimated time to complete this task. |
Instructions (Manual) |
Enter any specific task instructions here. If you create a workpack report, this can provide guidance to the inspection engineer. |
Instructions (Lookup) |
Choose the AIG field (if any) that contains the instructions for this task. |
Start (Manual) |
Enter a value that defines the first occurrence (or workpack) to create this task. This can either be a number type field which specifies the first occurrence, or a date type field (such as “last inspected date”). The Update/Apply process will work out the occurrence based on the date. |
Repeat (Manual) |
Enter a value that defines the frequency that the task is to be created. This can be either a number type field (which will be considered a frequency), or a date type field (such as “next inspection date”). For example, if you enter 3 in this field, a task will be created at every third occurrence. The Update/Apply process will figure out the occurrence based on the date. |
Start (Lookup) |
Choose the AIG field that defines the first occurrence (or workpack) to create this task. This can either be a number type field which specifies the first occurrence, or a date type field (such as “last inspected date”). The Update/Apply process will work out the occurrence based on the date. If a date type field is used, it will auto-populate the Due Date field of planning tasks generated by this template. |
Repeat (Lookup) |
Choose the AIG field which defines the frequency that the task is to be created. This can be either a number type field (which will be considered a frequency), or a date type field (such as “next inspection date”). The Update/Apply process will figure out the occurrence based on the date. |
Create Action |
Determine when exactly a task should be created. Choose from the following options:
|
Anomaly Action |
If this planning task is related to a specific anomaly action, then click on the ellipsis button and choose the relevant anomaly action from the list. |
Details |
You can specify a reference or source for the planning template task, for example, “Risk Based Assessment” or a “company procedure number”. |