IC-Inspection 5 Users
If you’ve upgraded from IC-Inspection version 5 to version 6, here are some quick things that you should know:
The window manager has been replaced with the same panel manager used in NEXUS IC 6’s Inspections screen. See Manage My Desktop for more details.
All grids in version 6 work in the same way. Once you’ve learned one of them, you’ve essentially learned them all. (Exception: There are one or two grids where the new multi-edit feature doesn’t work.)
The Events toolbar is gone — use the Event Launcher and/or shortcut keys set up through Event Templates instead.
The Events pane is now called Active Events.
The Database Information pane is now called Active Inspection.
The Assets window no longer has a column to show the number of remaining tasks. An Incomplete Tasks traffic light has been created to replace this feature.
Asset information is now editable in IC-Inspection, if the user has that security permission.
Text overlay is now part of Devices. Text Overlay Server is gone, as text overlay functionality is now incorporated directly into IC-Recorder (and some other third-party DVRs).
The following windows are removed: CP Stab, Operation, Survey Charts, Video, Video Recorder. (If you want video preview, just run an IC-Recorder.)
The Task Information summary showing number of tasks remaining has been removed. If you want similar functionality back, add a traffic light.
Pipeline View (and Pipeline View Secondary) have been replaced with the all-new 3D Pipeline View.
We now support 3D DWG drawings. (Bear in mind that large 3D DWGs may be slow.)
If you are using a third-party DVR, you should test its integration with IC-Inspection 6 well ahead of your inspection. Third-party DVRs must now support our generic DVR control protocol to be supported in IC-Inspection.
See also NEXUS IC 5 Users upgrade notes.