Upgrading¶
If you are upgrading from NEXUS IC version 5:
- We suggest consulting with us. Email us at support@nexusic.com.
- Ensure that you have used NEXUS 5’s Database Backup feature to take a backup of your version 5 database and have put the backup in a safe place.
- In NEXUS IC 5, ensure that a user account exists that has permission to upgrade the database. In , check for both the Administrators group and the user account you plan to use. If in doubt, set both to read/write.
- Restore the database with NEXUS IC 6. (We recommend not just connecting to the existing database, because if you do this you will not get an option to set a backup path. This backup path is necessary for the upgrade to work correctly.)
You will receive an upgrade prompt. Note that the upgrade is irreversible (which is why you took a backup) and may take some time. (It’s OK to kick it off in the evening and check the results in the morning — it doesn’t need watching.)
At the end of the upgrade, NEXUS IC 6 will have written a log, giving details of its actions. This log is named
IntegrityCentre_Trace.logand can be found in:C:\Users\[USER_NAME]\AppData\Roaming\NEXUSSearch this for the word “Warning” or the phrases “Warning Storage Engine” or “Warning Schema Update”. This latter phrase covers the most important issues. All these are warnings, not errors — they are merely here to let you know about changes that were made. Information messages can be ignored. Preserve a copy of this log file — otherwise it will be overwritten next time you restart NEXUS IC.
If you run into any problems, contact us with a backup of the database and/or a copy of the log file.
Traffic lights and report templates will not be ported from version 5 — you will need to recreate these afresh in your new version 6 database. (This is because these features work in a different way in version 6, for speed reasons.)